Grafite e grafene i materiali del futuro ? (1 Viewer)

PIZZODIGINO

Pacifico
VANCOUVER, BRITISH COLUMBIA--(Marketwired - Apr 23, 2014) - Flinders Resources Limited ("Flinders" or the "Company") (TSX VENTURE:FDR) is pleased to provide a further update on the work program underway to restart graphite production from the Woxna mine and processing facility in central Sweden. Woxna is a fully permitted brownfields graphite mine, having been on care and maintenance since 2001. The plant refurbishment is on track to recommence production in July 2014.



Luglio si avvicina e il prezzo dell'azione sente già l'effetto estate; chissà se quello attuale è solo un fuoco di paglia, o l'inizio di un vero e poderoso rialzo ?
 

PIZZODIGINO

Pacifico
Ho letto sul sito di Zenyatta Ventures che loro hanno scoperto una miniera di grafite unica al mondo (ne esiste solo una in Sry Lanca) dalla quale si può estrarre grafite che si può trasformare a poco costo in una forma di purezza del 99,99 %; attualmente una tale purezza è ottenuta solo con costosi procedimenti da oltre 6.000 $ la tonnellata e la grafite così ottenuta è venduta a prezzi che vanno dai 7.000 ai 20.000 $ la tonnellata (fate conto che la grafite normale viene venduta a circa 1.800 $ la tonnellata).
Nel sito non dicono che quantità di grafite è presente nella miniera e quanta grafite estrarranno ogni anno. Dicono invece di essere stati avvicinati da diverse imprese del settore e non escludono che possano collaborare con una di esse per sviluppare la miniera.
Ad oggi Zenyatta capitalizza 183.000.000 di $ canadesi.
Che sia una gallina dalle uova d'oro ?
Se volete fatevi un giro sul loro sito e troverete cose davvero interessanti.
 

PIZZODIGINO

Pacifico
Ho scritto a Zenyatta Ventures per chiedere quando inizieranno l'attività di estrazione e quale quantità di grafite fanno conto di produrre e mi hanno risposto dicendo che loro non sono una miniera ma "a junior exploration company".
Sono rimasto senza parole.
 

PIZZODIGINO

Pacifico
Mason graphite e' l'azionista di maggioranza

NanoXplore at a Glance

NanoXplore is a Montreal-based company specializing in the unique science of graphene and its derivative materials, and is very well placed to address three key challenges facing the graphene industry today:
> NanoXplore’s unique production process provides a clear path to high-volume, low-cost production (tonnes of material monthly at dollars per gram);
> NanoXplore’s production techniques are environmentally friendly and compatible with a wide range of manufacturing processes and government regulations; and
> NanoXplore technology allows for unparalleled integration with a broad range of industrial materials, in two ways:
1. The production process creates edge functionalized graphene in situ, without additional process steps or complexity; and
2. In addition to graphene material, NanoXplore offers customers a wide range of graphene composites (metals, metal oxides, polymers) at very attractive price points.
Who we are

NanoXplore brings together a team of seasoned business leaders and material scientists specializing in the science of graphene and its derivative materials. Our team has the industrial experience to enable customers to incorporate graphene materials into their products across a wide array of industries; this integration capability sets us apart from other graphene producers.


Products and Markets

NanoXplore produces:
- graphene and related derivative materials directly from high quality flake graphite; and
- a wide range of graphene composites (metals, alloys, metal oxides, polymers).
NanoXplore’s initial focus is on applications where graphene provides significant added value and bulk quantities of high quality graphene provide a competitive advantage. Near term opportunities are in industries such as paints and lubricants, textiles, and energy.
 
Ultima modifica:

PIZZODIGINO

Pacifico
Energizer resources

We are targeting mid-2016. Once we secure off takes, and project financing, the actual construction time for the mine is 9-12 months.
 

PIZZODIGINO

Pacifico
Primo contratto di vendita di grafite

Flinders Announces First Sales Contract Secured-Woxna Graphite Mine, Sweden

V.FDR | 57 minutes ago

VANCOUVER, BRITISH COLUMBIA--(Marketwired - May 6, 2014) - Flinders Resources Limited ("Flinders" or the "Company") (TSX VENTURE:FDR) provides an update on the Company's European sales and marketing programs, as graphite production is set to recommence in July 2014 from the 100% owned Woxna graphite mine and processing facility in central Sweden.

Key Points:
•Flinders has been working to re-establish its sales and distribution network throughout Europe;
•An initial sales contract has been signed with a former European customer;
•The Woxna Graphite project is strategically located in central Sweden, a gateway to the European Union graphite market;
•Sales efforts are continuing and the Company anticipates that more contracts will be concluded as graphite production is set to recommence in July 2014.

Blair Way, President & CEO states, "Securing our first sales contract is great news and a vote of confidence from our former customers. Our marketing endeavors are starting to have an impact in line with our restart of production. This is an exciting time for the company as we become the first TSX Venture Exchange listed company to produce and sell graphite product."

In addition to the previously announced processing plant refurbishment activities, Flinders has been working to re-establish its sales and distribution network throughout Europe. As for all industrial mineral products, customers are seeking stable and reliable producers that can consistently meet quality standards and delivery schedules. The Company has been meeting with former and potential new customers as part of its efforts to re-establish its sales base. As part of these marketing efforts, the Company is pleased to report that the initial sales contract has been signed with one of its former European customers. The initial sales contract does not represent a material portion of the Company's production capacities; however, the conclusion of this agreement is an important milestone for the Company's marketing team. Fulltime sales and marketing efforts are continuing throughout Europe and the Company anticipates that more sales contracts will be concluded over the coming months.

The Woxna Graphite project is strategically located in central Sweden, a gateway to the European Union graphite market. The facility is located approximately 3.5 hours' drive north of Stockholm and less than 2 days drive to most customers in Europe. Proximity to markets is a key differentiator in marketing industrial minerals. Woxna's central location provides a significant marketing advantage due to shorter distances and lower transportation costs. In addition, the Woxna processing facility has the ability to respond quickly to customers' specific needs within very short timeframes.

On behalf of the Board,

Blair Way, President and CEO
user_offline.gif
 

PIZZODIGINO

Pacifico
TORONTO, ONTARIO--(Marketwired - May 6, 2014) - Energizer Resources Inc. (EGZ.TO) (ENZR) (YE5.F) ("Energizer" or the "Company") is pleased to provide a summary of the milestones achieved over the past 18 months and the current status on its flagship Molo Graphite Project in Madagascar.



Feasibility Study in Progress
After completing a private placement on January 15th of this year, Energizer launched a Feasibility Study (FS) through its EPCM contractor, DRA, which is Africa's leading mine engineering and construction company. As part of this study the following work has been completed:
Discussions with Madagascar-based contractors regarding fuel, logistics, equipment, civil engineering and earthworks.
29 infill diamond drill holes and 16 trenches to elevate a portion of Molo Graphite Project's Canadian National Instrument ("NI") 43-101 compliant indicated resource to measured status.
3-D variability test work drilling with 4 diamond drill holes.
9 geotechnical holes for quantification of rock mechanics.
Detailed topographic surveying for pit shell modeling, civil works and hydrogeological analysis.
Topsoil thickness survey over deposit (deposit found to be covered by a thin veneer of soil averaging a thickness of 0.8 metres).
Hydrogeological test work over the deposit, including a resistivity survey and water sample analysis.
Richard Schler, Energizer's Chief Executive Officer stated, "We look forward to building on the substantial progress we have achieved over the past months in advancing our Molo Graphite Project, which included the completion of an operational pilot plant run as part of our Molo Feasibility Study. I believe this will be an exciting year for Energizer as we work towards achieving the important milestones of securing both mine financing and off-take agreements. Although we have been very active over the past few months pursuing these initiatives, they are tasks that do not easily lend themselves to providing regular news flow. With the recent positive developments in the global flake graphite market centering around lithium-ion batteries for electrical vehicles and large scale energy storage, I believe that conditions are ideal to support the rapid advancement of the Molo Graphite Project".
Feasibility Study Progress Builds Upon Milestone Accomplishments
In November 2012, Energizer announced its NI 43-101 resources estimate with 9,246m of drilling, establishing the Molo as one of the largest known, all-flake graphite deposits in the world; <UL id=yui_3_9_1_1_1399389588369_1243 style="LIST-STYLE-TYPE: circle"> <LI id=yui_3_9_1_1_1399389588369_1246>84.0Mt Indicated @ 6.36% carbon (C). <LI id=yui_3_9_1_1_1399389588369_1242>40.3Mt Inferred @ 6.29%C.</UL>
On February 26, 2013, Energizer announced the positive results of a PEA study, indicating robust economics: $421 Million USD Pre-tax NPV discounted @ 10%; 48% Internal rate of return (IRR); 3-year payback; $162 Million USD Capital cost.
On October 21, 2013, Energizer announced the signing of a Letter of Intent with Caterpillar Mining Finance regarding project financing loan arrangements for the Molo mine.
On November 6, 2013, Energizer announced the results of GDMS analysis testing by SGS Canada Inc, the highest level of analytical testing possible, and confirmed that the Molo graphite concentrate can achieve an ultra-high purity of greater than 99.9%. The hydrometallurgical purification test used conventional leach technology.
On November 20, 2013, Energizer announced the appointment of Robin Borley, B.Tech, Mining Engineering as a Board Director and Senior Vice President of Mine Development. Mr. Borley served previously as Mining Director for DRA.
On January 15, 2014, Energizer announced that it had closed a private placement of 61,204,067 common share units at a price of $0.12 for gross proceeds of C$7,344,488
On January 31, 2014, Energizer announced the robust results from the completion of a large scale pilot plant operation. Over 13 tonnes of Molo graphite concentrate was produced and results confirmed that a significant portion (43.5%) of the flake size distribution is classified as "large" and "jumbo-flake", 78.3% of Molo flake meets the minimum required size to produce battery-grade graphite and up to 97.7% purity can be achieved. through simple flotation alone. These pilot plant results were superior to those released in the Company's positive PEA study.
On April 16, 2014, Energizer announced it finalized the purchase of the remaining 25% interest in the Molo Graphite Project from joint venture partner Malagasy Minerals Limited. This now gives the Company 100% ownership of the Molo Graphite Project area and a 100% interest to all of the industrial mineral rights within the acquired property, which totals 940 square kilometres (363 square miles).
Targeted Milestones
Energizer is targeting the following key milestones:
Upgrading the Molo resource from Indicated to Measured status by Q3 2014;
Completion of full feasibility study by Q4 2014;
Completion of partnership and financing agreements, which are currently ongoing.
Application for mining permit in Q4 2014 upon completion of the FS;
Estimated construction schedule of 12-16 months following the securing of mine permitting and financing. Project commissioning is targeted to begin in Q2/Q3 of 2016.
Qualified Person
Craig Scherba, P.Geo., President and COO is the qualified person for the technical information provided in this release.
 

PIZZODIGINO

Pacifico
Northern Graphite

So the grade is lower, but the final product is much more valuable. In fact, Northern's flake is so large, there aren't really existing prices for it. It's assumed they'd be somewhere near $3,000/tonne.
Using the conservative 80% figure, the company is looking at a 1.35 million tonnes of large flake, high carbon graphite. (1.69 million tonnes x .80).
Multiply that by a conservative $2,500/tonne (prices are only expected to rise), and you get a $3.37 billion resource. There will be costs for sure, including permitting, building the mine, extraction, consulting, etc.
But when an $0.80 company with a $40 million market cap is sitting on a $3.37 billion resource, I think the stock implications are clear.
 

PIZZODIGINO

Pacifico
Mi domando sempre come mai le grosse imprese minerarie non entrino nel business della grafite. Mi sembra strano che lascino in mano a delle start up un mercato così interessante e promettente. A meno che entreranno in azione quando i progetti saranno più avanzati e le miniere cominceranno a sfornare grafite.
 

Users who are viewing this thread

Alto